Do you want to know more about process optimisation at Rhenus Contract Logistics? The full case study is now available for download.
A project was subsequently initiated to investigate how capacity could be increased during peak times, which consisted of two phases. During phase one, Vanderlande’s process engineers analysed the system, and came up with recommendations to increase the peak capacity of processed items. The second project consisted of operational improvements and technical modifications to the existing system.
As a result of all changes, Rhenus is ready to match the expected future growth of its customer. This has been achieved primarily by extending the system’s capabilities within its current boundaries. The solution is also future-proof and features in-built redundancy.